Build: 2.4 crore primary healthcare centres. That’s at least 3 for every village, at a cost of Rs 30 lakh each.
Build: 24.1 lakh Kendriya Vidyalayas at a cost of Rs 3.02 crore each, with two sections from Class VI to XII.
Construct: 14.6 crore low-cost houses assuming a cost of Rs 5 lakh a unit.
Set up: 2,703 coal-based power plants of 600 MW each. Each costs Rs 2,700 crore.
Supply: 12 lakh CFL bulbs. That’s enough light for each of India’s 6 lakh villages
Construct: 14.6 lakh km of two-lane highways. That’s a road around India’s perimeter 97 times over.
Clean up: 50 major rivers for the next 121 years, at Rs 1,200 crore a river every year.
Launch: 90 NREGA-style schemes, each worth roughly Rs 81,111 crore.
Announce: 121 more loan waiver schemes. All of them worth Rs 60,000 crore.
Give: Rs 56,000 to every Indian. Even better, give Rs 1.82 lakh to 40 crore Indians living BPL.
Hand out: 60.8 crore Tata Nanos to 60.8 crore people. Or four times as many laptops.
Grow the GDP: The scam money is 27% more than our GDP of Rs 53 lakh crore."
Greed, graft, politics, bribery, dirty money. Just another day in the life of a nation still rated among the most corrupt in the world. Scan the scams that have grabbed headlines, destroyed reputations and left many people poorer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment